Projects

CASE STUDIES

Boeing 737

Re-configuration of charter aircraft to one class of business seating throughout

     AgustaWestland 109E

Avionics and electrical installation of communication and navigation systems with associated electrical load analysis

AIRCRAFT WORK
Airbus A321 Installation of lightweight seats and change of pitch associated with revised capacity
Boeing 747 De-activation of cockpit humidifier for climate control
Boeing 777 VIP installation of KA Band and live television
Dassault Falcon EASA verification of VIP in-flight entertainment previously certified for FAA
Boeing 727 Avionics STC installation of an upgraded Flight Management System

Airbus A320

Removal of lavatories and replacement with seating capacity
Share by: